Sustainable Development in Industrial Ventilation

Latest UK News: Welcome Richard Kelly | Apprentice of the Year | 20 year old system updated

Sustainable Development in Industrial Ventilation

The best route to sustainable development in industrial ventilation, dust extraction and waste extraction is through the design of the system. Moving air requires energy. Heating air requires energy. In both cases the potential to save energy over a prolonged period through good design exceeds that from other current efficiency developments. Key points of design include:

DELTA NEU supplies a wide range of UK based manufacturing companies with ventilation and process extraction solutions. The equipment used invariable impacts upon a company's environmental policy in terms of sustainable development, energy consumption, environmental emissions or waste materials from the production process or maintenance of equipment. The design of any system therefore needs to take these factors into account and this article describes some of the basics involved, often over-lapping production, maintenance, health and safety, and financial considerations.

Air volume. The broad spectrum of industrial ventilation and process extraction requirements means that a simple solution to sustainable development is not possible as, for the most part, each system is a bespoke design for the specific application. However, optimising the air volume in each design is without doubt one of the best. Why?

How is this achieved? Often through the design of the hood, the position relative to the emission source and how much that source is enclosed.

Diagram of hoods, positions and related air volumes

Diagram of hoods, positions and related air volumes

The hood designs in the diagram above represent concepts as there will often be limitations on how far this design philosophy can be followed. However, it is clear to see that the position of the hood relative to the emission source and changing to an enclosure hood design, where practicable, could reduce the required extraction air volume significantly.

Fan efficiency. The range of fans used across the application of ventilation and process extraction systems being typically considered could have efficiencies from 50% to 80%. The fan efficiency compares the input energy to the work done and has a significant impact on energy consumption, for example,

Based on 25kW aerodynamic energy requirement and an energy cost of 10p/kWh

If this is compared to the stated difference in efficiency between IE3, IE2 and IE1 motors of around 1.5-2%, at these motor ratings, then notwithstanding the possibly increased capital cost of selecting a higher efficiency fan, the energy savings through the 40,000 hour life cycle are vastly more significant than the initial costs. For more information on these motor standards, look up "Premium efficiency" on Wikipedia.

Motor control. A related aspect to consider is the motor control where further energy saving possibilities exists although often not through the widely promoted speed or frequency inverter control.

In the first instance it is necessary to appreciate the laws of physics which apply to fans once installed in a system, assuming there are no changes to the ducting design.

However, a fan only absorbs the power required to do the work so, reducing the speed by 10% through a change in the drive belts may provide the saving at a modest investment. And as the power and motor size increase the savings become disproportionately greater.

% fan speed 80% 90% 100% 110%
% motor load kW 51% 73% 100% 133%

Table of motor power change with fan speed change

Example

Of course this is only applicable to a fan with a drive belt system fitted. An inverter controller will do the same, although the installation would cost more and an older motor may not be suitable for frequency variation control.

It should be noted there are certain advantages in using an inverter over the simple drive belt option including:

In designing an extraction system, it is prudent and not untypical to err on the side of caution and allow for a modest increase in airflow and hence fan speed on completion of the installation, which would have an impact on the power required, and to select a motor one size above the bare minimum required. However, once installed and commissioned at the correct speed, the load on the motor may be some way below the motor duty, although only drawing the proportionate electrical current. Often a case is made for inverters based on the installed power rather than absorbed power of the fan motor. It is fairly simple for an electrical engineer to measure the running current of the motor compared to the motor rated full load current (FLC) to provide an indication of the energy being used .

Air input. Exhausted air must be replenished either uncontrolled through egress into the building or controlled through an air make-up supply. Whenever the external temperature is below the required internal level, heat energy will also be required. Whether or not the air entering is controlled or not is often dependant on the building size and relative amount of extracted air. As an example, 70kW of heat energy would be required for a 20OC temperature rise in 10,000m3/h and with a 5p/kWh heat energy, could cost around £10,000 per annum on a 24/7 operation.

More sustainable approaches to air make-up include controlled introduction which reduces draughts and may, in some instances, lessen the heat load required. Re-using exhausted and filtered air will have an operational cost however often shows a payback within two to three years. Although less efficient than returning filtered air, heat exchangers may also enable the re-use of exhausted heat energy when filtering in impracticable. Sources of "free" heat should also be considered, compressors and hot process areas being valuable sources on occasion.

Once into operation the levels of training and maintenance can have an impact on wasted energy, environmental emissions or waste materials requiring landfill disposal.

The main objective under these headings is achieving optimum performance. By definition energy, emissions and waste are then controlled. It is a difficult position to reach and maintain however DELTA NEU offers training, support and a top level service team. As ventilation and process extraction, (dust or waste), provide secondary or support roles to the principle production process all too often they get a lesser level of training and maintenance. Performance may decline gradually over time and often goes unnoticed with some examples including:

In conclusion, sustainable developments in industrial ventilation and process extraction applications are not only achievable but may be quite significant because they are based on good system understanding, design and use. Interestingly many recent developments in energy efficiency are over shadowed by the improvements which may be possible through design, equipment selection and an on-going user training and maintenance programme. It is clear that any low cost installation advantage may be far from the lowest overall cost and soon offset as running and service costs are included over a modest period of time. Also, when using and maintaining the system as intended, the safety and protection provided will be optimised.

Peter Dowell

Managing director

DELTA NEU Limited

Download Sustainable Development in Industrial Ventilation PDF

 

Sitemap | Accessibility

LinkedIn [email protected] | 0161 456 5511